Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: file_put_contents(cache/73e722cd839895f76b13bc3a0c48e49a9937424a.cache): Failed to open stream: No space left on device in /www/wwwroot/jsc.com/index.php on line 24
“海角社区id:1120.7126”-译文小记

成达万高铁全线首海角社区id:1120.7126座超万吨转体梁成功转体

来源: 中国基金报
2025-04-17 05:13:06

最佳回答

“海角社区id:1120.7126”成达万高铁全线首海角社区id:1120.7126座超万吨转体梁成功转体

成达<strong class=海角社区id:1120.7126万高铁全线首座超万吨转体梁成功转体"> 海角社区id:1120.7126 中新社记者 刘忠俊 摄 灰色 白色 上一图集 成达万高铁全线首座超万吨转体梁成功转体

航拍青海中控50MW光热电站:“大地之镜”追光逐日产“绿能”

下一图集 成达万高铁全线首座超万吨转体梁成功转体

重庆国际铁路港综合保税区竣工

海角社区id:1120.7126 中国新闻网 白色 灰色 1/7

四川省南充市嘉陵区境内,新建的成都至达州至万州高速铁路(简称成达万高铁)大通镇跨达成铁路特大桥转体梁逆时针旋转44度,安全顺利到达指定位置,成功完成上跨运营繁忙的达成铁路施工作业。大通镇跨达成铁路特大桥是全线首座转体梁,全长783.54米,转体梁长121米、梁面宽12.6米、总重量11000吨。成达万高铁是中国“八纵八横”高铁网沿江通道的重要组成部分,正线全长477公里,设计时速350公里。图为4月15日晚间拍摄的大通镇跨达成铁路特大桥转体前的现场情况。(无人机照片)

【编辑:曹淼欣】

推荐图集 更多

发布于:陕西宝鸡凤县
声明:该文观点仅代表作者本人,搜狐号系信息发布平台,搜狐仅提供信息存储空间服务。
用户反馈 合作

Copyright © 2023 Sohu All Rights Reserved

搜狐公司 版权所有