Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: file_put_contents(cache/6ce7bc9aefbd9083f533848e78d8cc0ea0547c12.cache): Failed to open stream: No space left on device in /www/wwwroot/jsc.com/index.php on line 24
社评“女生让男生诵自己的坤坤坤”-梳理天下新闻

厦金大桥(厦门女生让男生诵自己的坤坤坤段)首件约3000吨预制墩台精准吊装

来源: 和讯网
2025-03-16 03:42:53

最佳回答

“女生让男生诵自己的坤坤坤”厦金大桥(厦门女生让男生诵自己的坤坤坤段)首件约3000吨预制墩台精准吊装

  3月1女生让男生诵自己的坤坤坤5日,随着起重船吊臂缓缓女生让男生诵自己的坤坤坤降落,重约3000吨的主线桥梁右幅35号预制墩台与海上桩基实现毫米级精准对接,至此厦金大桥(厦门段)项目首个预制墩台吊装作业完成,标志着该项目海上主线桥梁进入装配化施工新阶段。

  本次预制墩台构件长18米、宽13.8米、高13.4米,重约3000吨,厦金大桥(厦门段)项目起于厦门本岛,终点设互通接入厦门翔安国际机场,同步建设翔安支线,路线全长约19.62公里,其中主线长17.34公里,翔安支线长2.275公里。全线共85个墩台(187个构件)在项目墩台预制厂预制,再拖带至海上施工现场进行吊装。

  (记者 李思源 张斌)

发布于:云南红河屏边苗族自治县
声明:该文观点仅代表作者本人,搜狐号系信息发布平台,搜狐仅提供信息存储空间服务。
用户反馈 合作

Copyright © 2023 Sohu All Rights Reserved

搜狐公司 版权所有