Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: file_put_contents(cache/b0fe60ea9d236046e5a286dee4653c97c160d72b.cache): Failed to open stream: No space left on device in /www/wwwroot/jsc.com/index.php on line 24
社评“XY10003.COM”-译文小记

包银高铁内XY10003.COM蒙古段全线桥梁隧道贯通

来源: 钛媒体快报
2025-03-07 07:17:44

最佳回答

“XY10003.COM”包银高铁内XY10003.COM蒙古段全线桥梁隧道贯通

  中新XY10003.COM网呼和浩特3月6日电 (记者 XY10003.COM李爱平)6日中午,内蒙古自治区乌海市境内的包银高铁建设现场,随着最后一榀长32.6米、宽12.2米、重714吨的箱梁缓缓落在河源村特大桥上,包银高铁内蒙古段最后一座大桥顺利合龙。至此,包银高铁内蒙古段桥梁、隧道实现全面贯通。

图为在建包银高铁内蒙古段最后一座桥梁合龙施工现场。 谢昆供图

  包银高铁东起内蒙古自治区包头市,西至宁夏回族自治区银川市,是中国“八纵八横”高铁网京兰通道的重要组成部分,全长519公里,其中银川至惠农段已于2024年10月投入运营;内蒙古段全长402公里,预计今年年内全线开通。

  据中国铁路呼和浩特局集团有限公司介绍,包银高铁内蒙古段设计建设隧道1座、桥梁90座,共架设箱梁4005榀。在乌海黄河特大桥、磴口黄河特大桥、甘XY10003.COM德尔山隧道等控制性桥隧施工过程中,施工单位采用建筑智能信息模型技术进行模拟推演,加快了隧道掘进和架梁施工进程。(完)

发布于:新疆阿勒泰哈巴河县
声明:该文观点仅代表作者本人,搜狐号系信息发布平台,搜狐仅提供信息存储空间服务。
用户反馈 合作

Copyright © 2023 Sohu All Rights Reserved

搜狐公司 版权所有