Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: Undefined array key 1 in /www/wwwroot/jsc.com/core/config.php on line 392

Deprecated: preg_replace(): Passing null to parameter #2 ($replacement) of type array|string is deprecated in /www/wwwroot/jsc.com/core/config.php on line 396

Warning: file_put_contents(cache/df2e80c41ce057c0fdbede7be43519abf63e6946.cache): Failed to open stream: No space left on device in /www/wwwroot/jsc.com/index.php on line 24
解惑“哥布林洞窟3双男主”-译文小记

中国首个立体确哥布林洞窟3双男主权光伏用海项目实现全容量并网发电

来源: 科技日报
2025-04-15 07:15:05

最佳回答

“哥布林洞窟3双男主”中国首个立体确哥布林洞窟3双男主权光伏用海项目实现全容量并网发电

  近日哥布林洞窟3双男主,中国首个立体确权光伏用海哥布林洞窟3双男主项目——华能滨州新能源85万千瓦光伏发电项目实现全容量并网发电。

  据了解,华能滨州光伏项目是国家海洋立体确权政策颁布后首个获批的光伏用海项目,该项目充分利用山东省滨州市沿海滩涂资源优势,在滩涂水面架设光伏板,因地制宜采用“渔光互补”“盐光互补”模式,在发电的同时兼顾海水晒盐与提溴等,实现海域空间立体开发和综哥布林洞窟3双男主合利用,助力黄河流域生态保护和高质量发展。

  该项目建成后,将成为山东省最大的单体新能源项目之一,每年可发电12.86亿千瓦时、节约标煤38.58万吨、减排二氧化碳91.77万吨。(祁建月 彭迪 李怡璇)

发布于:西藏那曲安多县
声明:该文观点仅代表作者本人,搜狐号系信息发布平台,搜狐仅提供信息存储空间服务。
用户反馈 合作

Copyright © 2023 Sohu All Rights Reserved

搜狐公司 版权所有